Current level ISDC/ isdc_v2/ QLA

Schedule Report


Dates:

CurrentOriginal
Starting 14 JUL 1997 14 JUL 1997
Ending 07 AUG 2001 07 AUG 2001
Description :
Quick Look Analysis
Long Description :
Develop and write the Architectural Design Document for Quick Look Analysis (QLA ADD)
Coding and unit testing of the QLA infrastructure and writing of the required documentation
Integration of the infrastructure and the Instrument Specific Software (ISSW)
Testing of the whole subsystem QLA
Responsible:
Søren Brandt
The Gantt chart at this level

Gantt chart
Link to the equivalent Encapsulated PostScript file

Help
/home/pourbaix/astro/pm/pbx/schedule_new/42_isdc_v2.ts/60_QLA.ts/summary.rpt


D.Pourbaix