Current level ISDC/ isdc_v2/ SA

Schedule Report


Dates:

CurrentOriginal
Starting 14 JUL 1997 14 JUL 1997
Ending 01 MAY 2001 01 MAY 2001
Description :
Standard Analysis
Long Description :
Develop and write the Architectural Design Document for Standard Analysis (SA ADD)
Coding and unit testing of the SA infrastructure and writing of the required documentation
Integration of the infrastructure and the Instrument Specific Software (ISSW)
Testing of the whole subsystem SA
Responsible:
Pierre Dubath
The Gantt chart at this level

Gantt chart
Link to the equivalent Encapsulated PostScript file

Help
/home/pourbaix/astro/pm/pbx/schedule_new/42_isdc_v2.ts/50_SA.ts/summary.rpt


D.Pourbaix